Construction Inspection

New Hospital Pavilion

SPAAN Tech assisted during the construction of the new Hospital Pavilion at the University of Chicago Medical Center, an ambitious project which included: 350 new beds, additional outpatient facilities, laboratories, ambulatory services, and other elements).

During the design phase, STI provided programming to align all the hospital requirements with space allocations and provided IT consulting.

Phase III Engineering for I-80 Reconstruction

SPAAN Tech provided Phase III Engineering Services for construction management, construction inspection, and contract administration on I-80/94 (IL 394 to US 41).

Duties included: schedule and budget control, on-site material testing, and material quality assurance testing for advance work on the highways. The work also encompassed structure removal and replacement of Wentworth Avenue over I-80

The electrical contract included: high-mast lighting advance work, fiber optic cable and systems, CCTV, surveillance, and dynamic message sign systems.

North Avenue Streetscape

SPAAN Tech contributed to the design of a new streetscape of North Avenue, from Kilpatrick Avenue to Cicero Avenue.

The project involved: landscaping, drainage, street lighting, and sidewalk improvements. STI provided lighting and civil engineering design services, which included: drawing preparation, CADD, and construction phase services.

Navy Pier Restroom Renovations

SPAAN Tech provided architectural and engineering services for the renovation of both men’s and women’s public restrooms located in the Family Pavilion and the first floor of the Terminal Building. Renovations included new ceiling tile and grid, drywall, floor tile and toilet partitions.

SPAAN Tech prepared all civil design, electrical design, and specifications related to the project, which was designed to meet ADA requirements

Construction Management

SPAAN Tech, Inc. provides construction inspection services for various roadway, bridge, pavement resurfacing, and drainage projects for various roadways in Will and Cook Counties. These assignments require SPAAN Tech to provide a variety of staff for day and night operations, including both construction inspectors and project managers. Daily activities, such as completing documentation for the preparation of pay estimates and observing traffic control for proper installation, are also performed.